Budget Control Rules
Budget enforcement rules
On this page
#About Budget Control Rules
Budget enforcement rules. This is a working page: a list or workspace where you find and act on records in BSuit ERP (Finance & Accounting). It is used by staff (internal users). What you can see and do depends on your role and permissions.
#How to open it
In BSuit ERP, open Finance & Accounting and choose “Budget Control Rules”, or go directly to the address /finance-management/budget-control-rules.
#What you can do here
These controls are present in the page’s implementation. Whether you see a given one also depends on your permissions and on the data shown.
- Add new records — a form opens for the details.
- Change existing records.
- Delete records (you are asked to confirm).
- Bring records in from a file.
- Export what you see to a file.
- Print or save as PDF.
- Attach or upload files.
- Search within the page.
- Filter the data shown.
- Sort by a column.
- Page through long lists.
- Open dialogs or drawers for detail and confirmation.
#Fields
When you enter or change a control rule, these fields are on the form. Required fields must be completed before you can save.
| Field | Type | Required | Details | Refers to |
|---|---|---|---|---|
| Budget Version | text | No | — | — |
| Rule Code | text | Yes | — | — |
| Rule Name | text | Yes | — | — |
| Cost Center | select | No | — | Chosen from a list loaded by the page |
| Control Type | select | No | One of: No Control, Soft Stop (warn only), Hard Stop (block), Approval Override (block, releasable). | — |
| Control Period | select | No | One of: Daily, Monthly, Quarterly, Annual. Default: Annual. | — |
| Threshold % | number | No | — | — |
| Warning % | number | No | — | — |
| Allow override approval (Hard Stop) | checkbox | No | — | — |
| Active | checkbox | No | — | — |
#Who can do this
Super Admin and other superuser accounts can always see and do everything, regardless of this list. For everyone else, these are the standard roles that have been granted a permission here in this system’s current setup — an organisation can add, remove or customise roles and their permissions, so treat this as an example, not a guarantee.
| Role | Create | Edit | View |
|---|---|---|---|
| Finance Manager | Yes | Yes | Yes |
#Data stored for each record
The full list of 19 stored fields, including ones not shown on the form, is in the BudgetControlRule data reference.
#What the list shows
The list displays these columns; use search and filters to narrow it.
- Code
- Name
- Control Type
- Period
- Threshold %
- Warning %
- Active
#How to add a control rule
Steps follow this page’s form. You need permission to create records here.
- Open Finance & Accounting › Budget Control Rules from the menu.
- Choose the Add button (a plus icon) above the list.
- Complete the required fields: Rule Code, Rule Name.
- Some fields offer a fixed list: Control Type: No Control, Soft Stop (warn only), Hard Stop (block), Approval Override (block, releasable); Control Period: Daily, Monthly, Quarterly, Annual.
- Save. The new record appears in the list; use search or the filters to find it again.
- To change it later, open the record from the list and edit it.
- Deleting asks you to confirm. Records that other records refer to may be refused or may affect them (see “Where … is used as a reference”).
#Observed on a running system
On 2026-09-21 this page was opened in a browser as a test administrator. This is what was visible on screen. Your own view can differ with your role, data and settings.
| Button |
|---|
| Close |
| Add New |
| Bulk Insert |
#If something is missing or fails
- No data: confirm the company or context selected in the top bar, and any filters or date range in use.
- An action is hidden or disabled: it usually needs a permission your role does not have. Ask an administrator to check your effective access.
- An error message appears: note the message, the page address and what you were doing, and contact support with those details (never include passwords).
#About this guide
This guide was generated from the page’s implementation. It has not yet been reviewed by a person against a running system, so treat it as a reference for what the page contains rather than a complete procedure.
About this guide
- Status
- Partially reviewed
- Application
- BSuit ERP
- Audience
- Staff (internal users)
- Owner
- BSuit documentation team
- Reviewer
- Not yet reviewed
- Last verified
- Never
- Checked against
- Generated from source revision a36c7a086 on 2026-10-02
- Seen on a running system
- 2026-09-21
- Help version
- 2026.0.0-preview
- Guide ID
erp:/finance-management/budget-control-rules
