Future Resource Planning
Project and MRP manpower demand versus verified workforce capacity
On this page
#About Future Resource Planning
Project and MRP manpower demand versus verified workforce capacity. This is a working page: a list or workspace where you find and act on records in BSuit ERP (Human Resources). It is used by staff (internal users). What you can see and do depends on your role and permissions.
#How to open it
In BSuit ERP, open Human Resources and choose “Future Resource Planning”, or go directly to the address /hr/future-resource-planning.
#What you can do here
These controls are present in the page’s implementation. Whether you see a given one also depends on your permissions and on the data shown.
- Search within the page.
- Filter the data shown.
- Sort by a column.
- Page through long lists.
#Observed on a running system
On 2026-09-21 this page was opened in a browser as a test administrator. This is what was visible on screen under the heading “Future Resource Planning”. Your own view can differ with your role, data and settings.
| Button |
|---|
| Recalculate |
#If something is missing or fails
- No data: confirm the company or context selected in the top bar, and any filters or date range in use.
- An action is hidden or disabled: it usually needs a permission your role does not have. Ask an administrator to check your effective access.
- An error message appears: note the message, the page address and what you were doing, and contact support with those details (never include passwords).
#About this guide
This guide was generated from the page’s implementation. It has not yet been reviewed by a person against a running system, so treat it as a reference for what the page contains rather than a complete procedure.
About this guide
- Status
- Partially reviewed
- Application
- BSuit ERP
- Audience
- Staff (internal users)
- Owner
- BSuit documentation team
- Reviewer
- Not yet reviewed
- Last verified
- Never
- Checked against
- Generated from source revision a36c7a086 on 2026-10-02
- Seen on a running system
- 2026-09-21
- Help version
- 2026.0.0-preview
- Guide ID
erp:/hr/future-resource-planning