Engineering Change Orders
Approve a board revision change — BOM diff, cost impact, affected orders and stock; header + part-level impact lines
On this page
#About Engineering Change Orders
Approve a board revision change — BOM diff, cost impact, affected orders and stock; header + part-level impact lines. This is a working page: a list or workspace where you find and act on records in BSuit ERP (Manufacturing). It is used by staff (internal users). What you can see and do depends on your role and permissions.
#How to open it
In BSuit ERP, open Manufacturing and choose “Engineering Change Orders”, or go directly to the address /mrp/engineering-change-orders.
#What you can do here
These controls are present in the page’s implementation. Whether you see a given one also depends on your permissions and on the data shown.
- Add new records — a form opens for the details.
- Change existing records.
- Delete records (you are asked to confirm).
- Bring records in from a file.
- Search within the page.
- Open dialogs or drawers for detail and confirmation.
#Data stored for each record
The form layout of this page could not be read from its source, so here is everything BSuit stores for an engineeringchangeorder (see also the EngineeringChangeOrder data reference). Which fields appear on screen depends on the page and your configuration.
| Field | Stored as | Type | Required | Max length | Refers to |
|---|---|---|---|---|---|
| Company Id | CompanyId | Text | No | — | Company |
| Eco Number | EcoNumber | Text | No | — | — |
| Title | Title | Text | No | — | — |
| Reason | Reason | Text | No | — | — |
| Change Category | ChangeCategory | Text | No | — | — |
| Board Key | BoardKey | Text | No | — | — |
| Product Id | ProductId | Text | No | — | Product |
| From Design Bom Id | FromDesignBomId | Text | No | — | — |
| To Design Bom Id | ToDesignBomId | Text | No | — | — |
| Status | Status | Text | No | — | — |
| Workflow Instance Id | WorkflowInstanceId | Text | No | — | WorkflowInstance |
| Diff Snapshot Json | DiffSnapshotJson | Text | No | — | — |
| Added Part Count | AddedPartCount | Whole number | No | — | — |
| Removed Part Count | RemovedPartCount | Whole number | No | — | — |
| Quantity Changed Count | QuantityChangedCount | Whole number | No | — | — |
| Designator Changed Count | DesignatorChangedCount | Whole number | No | — | — |
| Substituted Count | SubstitutedCount | Whole number | No | — | — |
| Unchanged Part Count | UnchangedPartCount | Whole number | No | — | — |
| Estimated Unit Cost Before | EstimatedUnitCostBefore | Number (decimal) | No | — | — |
| Estimated Unit Cost After | EstimatedUnitCostAfter | Number (decimal) | No | — | — |
| Estimated Unit Cost Delta | EstimatedUnitCostDelta | Number (decimal) | No | — | — |
| Unpriced Part Count | UnpricedPartCount | Whole number | No | — | — |
| Affected Production Order Count | AffectedProductionOrderCount | Whole number | No | — | — |
| Affected Production Order Ids | AffectedProductionOrderIds | Text | No | — | — |
| Affected Stock Quantity | AffectedStockQuantity | Number (decimal) | No | — | — |
| Affected Stock Value | AffectedStockValue | Number (decimal) | No | — | — |
| Disposition | Disposition | Text | No | — | — |
| Effective Date | EffectiveDate | Date | No | — | — |
| Submitted By Id | SubmittedById | Text | No | — | — |
| Submitted At | SubmittedAt | Date and time | No | — | — |
| Approved By Id | ApprovedById | Text | No | — | — |
| Approved At | ApprovedAt | Date and time | No | — | — |
| Rejection Reason | RejectionReason | Text | No | — | — |
| Notes | Notes | Text | No | — | — |
| Is Active | IsActive | Yes / No | No | — | — |
| Sort Order | SortOrder | Whole number | No | — | — |
| Id | Id | Text | No | — | — |
| Created At | CreatedAt | Date and time | No | — | — |
| Updated At | UpdatedAt | Date and time | No | — | — |
| Is Deleted | IsDeleted | Yes / No | No | — | — |
#Observed on a running system
On 2026-09-21 this page was opened in a browser as a test administrator. This is what was visible on screen under the heading “Engineering Change Orders”. Your own view can differ with your role, data and settings.
| Button |
|---|
| New Engineering Change Order |
#If something is missing or fails
- No data: confirm the company or context selected in the top bar, and any filters or date range in use.
- An action is hidden or disabled: it usually needs a permission your role does not have. Ask an administrator to check your effective access.
- An error message appears: note the message, the page address and what you were doing, and contact support with those details (never include passwords).
#About this guide
This guide was generated from the page’s implementation. It has not yet been reviewed by a person against a running system, so treat it as a reference for what the page contains rather than a complete procedure.
About this guide
- Status
- Partially reviewed
- Application
- BSuit ERP
- Audience
- Staff (internal users)
- Owner
- BSuit documentation team
- Reviewer
- Not yet reviewed
- Last verified
- Never
- Checked against
- Generated from source revision a36c7a086 on 2026-10-02
- Seen on a running system
- 2026-09-21
- Help version
- 2026.0.0-preview
- Guide ID
erp:/mrp/engineering-change-orders
